Rio Tinto

Service: Engineering | Project: Pilbara Rail Network | Location: Pilbara

Lycopodium was engaged to provide an independent assessment of the root cause of track stability issue and recommend actions for temporary and permanent repairs.

Project Overview

In May 2016 Rio Tinto Iron Ore engaged Lycopodium to undertake a site assessment of various sections of the Pilbara rail network to review track stability and the interaction between in train breaking forces and track stability.

Lycopodium was referred to Rio Tinto due to many years of quality services delivered across other private heavy haul rail networks.

In undertaking the assessment the Lycopodium study team assessed condition data, train performance and indicators of rail creep at known critical areas. Additional data was captured during the assessment such as rail stress measurements.

Added Value

Independent review of the interaction between in-train breaking forces and track stability